publication venue for
- Two-level differential burn-in policy for spatially heterogeneous defect units in semiconductor manufacturing. 162:107768-107768. 2021
- Leveraging owners' flexibility in smart charge/discharge scheduling of electric vehicles to support renewable energy integration. 149:106762-106762. 2020
- Weighted picture fuzzy aggregation operators and their applications to multi-criteria decision-making problems. 137:106037-106037. 2019
- Resilience modeling of engineering systems using dynamic object-oriented Bayesian network approach. 130:108-118. 2019
- Agent-based discrete-event simulation model for no-notice natural disaster evacuation planning. 129:44-55. 2019
- Multi-objective framework for process mean selection and price differentiation with leakage effects under price-dependent stochastic demand. 127:698-708. 2019
- Distribution product packaging to maximize net revenue. 121:150-160. 2018
- Estimating the minimal revenue tolls in large-scale roadway networks using the dynamic penalty function method. 107:120-127. 2017
- Single-machine rework rescheduling to minimize maximum waiting-times with fixed sequence of jobs and ready times. 91:262-273. 2016
- Effect of upstream re-sequencing in controlling cycle time performance of batch processors. 88:206-216. 2015
- Critical street links for demand responsive feeder transit services. 66:584-592. 2013
- Joint shipment consolidation and inventory decisions in a two-stage distribution system. 66:1025-1035. 2013
- On the convergence of a new time window discretization method for the traveling salesman problem with time window constraints. 56:161-164. 2009
- A single resource scheduling problem with job-selection flexibility, tardiness costs and controllable processing times. 53:420-432. 2007
- Tool path generation for free form surfaces using Bezier curves/surfaces. 52:486-501. 2007
- Subset selection in multiple linear regression: a new mathematical programming approach. 49:155-167. 2005
- Solving large-scale requirements planning problems with component substitution options. 44:475-491. 2003
- Optimal scheduling of a single anaerobic digester with multiple feedstocks. 41:1-15. 2001
- A genetic algorithm for sequential part assignment for PCB assembly. 40:293-307. 2001
- A prototype of a feature-based multiple-alternative process planning system with scheduling verification. 39:109-124. 2001
- An investigation of the sensitivity of DEA to data errors. 41:163-171. 2001
- Lot streaming and scheduling heuristics for m-machine no-wait flowshops. 38:149-172. 2000
- Part family formation based on a new similarity coefficient which considers alternative routes during machine failure. 35:479-482. 1998
- Cellular manufacturing system based on new similarity coefficient which considers alternative routes during machine failure. 34:21-36. 1998
- Simulation-based methodology for machine cell design. 34:173-188. 1998
- A prototype solid-modeling-based automated process planning system. 31:169-172. 1996
- Manufacturing process planning in a concurrent design and manufacturing environment. 30:83-93. 1996
- Rapid prototyping work space optimization. 31:103-106. 1996
- Strategic transportation model for oil in US waters. 31:59-62. 1996
- AN ACTIVITY LAYER FOR AN INTELLIGENT AUTOMATIC PRODUCT DESIGN ENVIRONMENT. 29:717-721. 1995
- RAPID PROTOTYPING - APPLICATIONS IN ACADEMIC-INSTITUTIONS AND INDUSTRY. 29:345-349. 1995
- A GENETIC ALGORITHM FOR DISTRIBUTED SYSTEM TOPOLOGY DESIGN. 28:659-670. 1995
- Editorial. 28:495. 1995
- A PRODUCT DATA EXCHANGE INTEGRATION STRUCTURE USING PDES/STEP FOR AUTOMATED MANUFACTURING APPLICATIONS. 29:711-715. 1995
- A DECISION STRUCTURE USING GENERALIZED AND OR TREES CONTAINING CHANCE NODES. 26:151-171. 1994
- DESIGN AND IMPLEMENTATION OF A FEATURE-BASED AUTOMATED PROCESS PLANNING (FBAPP) SYSTEM. 27:1-4. 1994
- 2-MACHINE FLOWSHOP SEQUENCING WITH SPARSE PRECEDENCE CONSTRAINTS. 26:173-180. 1994
- A SURVEY OF DESIGN METHODS FOR MANUFACTURING CELLS. 25:487-490. 1993
- PERFORMANCE ANALYSIS OF THE CELLULAR MANUFACTURING SYSTEMS A DECISION-SUPPORT TOOL. 25:499-502. 1993
- STRATEGIC JUSTIFICATION OF ADVANCED AUTOMATED TECHNOLOGY SYSTEMS USING AN EXPERT-SYSTEM. 25:107-110. 1993
- A GROUP TECHNOLOGY-BASED METHODOLOGY FOR MACHINE CELL-FORMATION IN A COMPUTER-INTEGRATED MANUFACTURING ENVIRONMENT. 24:431-447. 1993
- APPLICATION OF OUTRANKING METHODS TO ECONOMIC AND FINANCIAL JUSTIFICATION OF CIM SYSTEMS. 25:357-360. 1993
- MANUFACTURING FEATURES EXTRACTION AND RECOGNITION IN AUTOMATED PROCESS PLANNING. 25:325-328. 1993
- A FEATURE-BASED DYNAMIC PROCESS PLANNING AND SCHEDULING. 23:141-144. 1992
- A METHODOLOGY FOR FORMING MANUFACTURING CELLS USING MANUFACTURING AND DESIGN ATTRIBUTES. 23:73-76. 1992
- AN OBJECT-ORIENTED WINDOW SCHEME FOR REPRESENTING DESIGN AND MANUFACTURING ACTIVITIES. 23:19-22. 1992
- DESIGN FRAMEWORKS FOR CONCURRENT ENGINEERING. 23:11-14. 1992
- MULTICRITERIA ANALYSIS IN THE EVALUATION OF ADVANCED MANUFACTURING TECHNOLOGY USING PROMETHEE. 23:455-458. 1992
- AN INTEGRATED COST ESTIMATING SYSTEM FOR CONCURRENT ENGINEERING ENVIRONMENT. 21:589-594. 1991
- A COMPUTER HIERARCHY STRUCTURE FOR ELECTRIC-POWER UTILITY. 21:507-511. 1991
- CONCURRENT ENGINEERING - THE MANUFACTURING PHILOSOPHY FOR THE 90S. 21:35-39. 1991
- REOPTIMIZATION PROCEDURES FOR NETWORKS WITH SIDE CONSTRAINTS. 20:243-249. 1991
- Flexible Inspection within an Aggregated Information Environment. 19:224-228. 1990
- A METHODOLOGY FOR EVALUATION COMPUTER INTEGRATED MANUFACTURING TECHNOLOGIES. 19:210-214. 1990
- AN ALGEBRAIC MODELING LANGUAGE AND MICROCOMPUTER ENVIRONMENT FOR LINEAR-PROGRAMMING AND RELATED OPTIMIZATION METHODS. 18:29-36. 1990
- TAILORING SEARCH STRATEGY FOR LITERATURE ON ECONOMIC JUSTIFICATION OF COMPUTER INTEGRATED MANUFACTURING. 19:544-547. 1990
- A JUSTIFICATION METHODOLOGY FOR AUTOMATED MANUFACTURING TECHNOLOGIES. 16:363-373. 1989
- A METHODOLOGY FOR ECONOMIC JUSTIFICATION OF FLEXIBLE MANUFACTURING SYSTEMS. 15:117-122. 1988
- CDF BOSS - A LANGUAGE AND MICROCOMPUTER IMPLEMENTATION FOR DISCRETE SIMULATION. 15:104-112. 1988
- A CAPITAL-INVESTMENT MODEL FOR ELASTIC DEMAND AND NONLINEAR PRODUCTION CAPACITY. 12:9-21. 1987
- FACILITIES PLANNING AND DESIGN WITH MICROCOMPUTERS. 13:332-335. 1987
- A MODEL FOR OUTPUT EVALUATION OF AN INTELLIGENT ROBOTIC ASSEMBLY STATION. 11:251-256. 1986
- AN INTERACTIVE PROGRAM ASSISTS LAYOUT PLANNING. 11:83-86. 1986
- PROGRAM ASSISTS ECONOMIC LIFE DETERMINATION. 11:119-123. 1986
- The kaspar wire-forming machine: An application of physical simulation to the design and implementation of an automated process control system. 10:89-97. 1986
- PHYSICAL SIMULATION - THE USE OF SCALED-DOWN FULLY FUNCTIONAL COMPONENTS TO ANALYZE AND DESIGN AUTOMATED PRODUCTION SYSTEMS. 8:73-85. 1984
- CAPACITY EXPANSION OF LINKED RESERVOIR SYSTEMS. 8:119-128. 1984
- COMPUTERIZED ANALYTICAL SOLUTIONS IN DYNAMIC-PROGRAMMING. 5:257-270. 1981
- PROPER METHOD OF REPORTING RESULTS FROM DIGITAL SIMULATIONS. 1:79-83. 1977
- Multivariate feed back control: an application in a productive process 2004
- MODELING DATA COMMUNICATION-NETWORKS 1982