publication venue for
- Capacity planning for long-term care networks. 48:1098-1111. 2016
- Production planning with price-dependent supply capacity. 48:938-954. 2016
- Guaranteeing performance based on time-stability for energy-efficient data centers. 48:812-825. 2016
- Axiomatic aggregation of incomplete rankings. 48:475-488. 2016
- Optimal pinging frequencies in the search for an immobile beacon. 48:489-500. 2016
- Nodal decomposition-coordination for stochastic programs with private information restrictions. 48:283-297. 2016
- A disaster evacuation network model for transporting multiple priority evacuees. 47:1287-1299. 2015
- A graph-theoretic approach for quantification of surface morphology variation and its application to chemical mechanical planarization process. 47:1088-1111. 2015
- Time series forecasting for nonlinear and non-stationary processes: a review and comparative study. 47:1053-1071. 2015
- Modeling dependence in health behaviors. 47:1112-1121. 2015
- Approximations to optimal sequences in single-gripper and dual-gripper robotic cells with circular layouts. 47:634-652. 2015
- Modulus prediction of buckypaper based on multi-fidelity analysis involving latent variables. 47:141-152. 2015
- Speculation in a two-stage retail supply chain. 46:1315-1328. 2014
- A note on picker blocking models in a parallel-aisle order picking system. 45:1345-1355. 2013
- A two-dimensional bin packing problem with size changeable items for the production of wind turbine flanges in the open die forging industry. 45:1332-1344. 2013
- Integrating virtualization, speed scaling, and powering on/off servers in data centers for energy efficiency. 45:1114-1136. 2013
- A multistage, semi-automated procedure for analyzing the morphology of nanoparticles. 44:507-522. 2012
- Nanomanufacturing systems: opportunities for industrial engineers. 44:492-495. 2012
- Non-parametric Bayesian modeling of hazard rate with a change point for nanoelectronic devices. 44:496-506. 2012
- Algorithms for multi-item procurement planning with case packs. 44:181-198. 2012
- Scheduling robotic cells served by a dual-arm robot. 44:230-248. 2012
- Large-scale order batching in parallel-aisle picking systems. 44:88-106. 2012
- Efficient control for a multi-product quasi-batch process via stochastic dynamic programming. 43:192-206. 2011
- Hospital stockpiling for disaster planning. 43:348-362. 2011
- Bayesian hierarchical model for combining misaligned two-resolution metrology data. 43:242-258. 2011
- Performance measurement in the warehousing industry. 43:220-230. 2010
- Predicting surgical case durations using ill-conditioned CPT code matrix. 42:121-135. 2010
- Robotic cells with stochastic processing times. 42:897-914. 2010
- Transient analysis of queues for peer-based multimedia content delivery. 42:881-896. 2010
- Sequential clinical scheduling with patient no-shows and general service time distributions. 42:354-366. 2010
- Throughput optimization in dual-gripper interval robotic cells. 42:1-15. 2010
- Residual-life estimation for components with non-symmetric priors. 41:372-387. 2009
- A stochastic overbooking model for outpatient clinical scheduling with no-shows. 40:820-837. 2008
- Gaussian process method for form error assessment using coordinate measurements. 40:931-946. 2008
- Robotic cells with parallel machines and multiple dual gripper robots: a comparative overview. 40:1211-1227. 2008
- Sensor-driven prognostic models for equipment replacement and spare parts inventory. 40:629-639. 2008
- Inventory and lead time planning with lead-time-sensitive demand. 39:439-452. 2007
- A (10/7)-approximation algorithm for an optimum cyclic solution in additive travel-time robotic cells. 39:217-227. 2007
- Allocating security resources to a water supply network. 39:95-109. 2007
- A heuristic for multi-item production with seasonal demand. 38:201-211. 2006
- A stochastic multi-item inventory model with unequal replenishment intervals and limited warehouse capacity. 37:1129-1141. 2005
- Residual-life distributions from component degradation signals: A Bayesian approach. 37:543-557. 2005
- Minimizing cycle time in large robotic cells. 37:123-136. 2005
- A single-machine distributed scheduling methodology using cooperative interaction via coupling agents. 37:137-152. 2005
- Economic lot scheduling with lost sales and setup times. 36:629-640. 2004
- Value of information in remanufacturing complex products. 36:265-277. 2004
- A Synthesis of Tactical Fleet Planning Models for the Car Rental Industry. 35:907-916. 2003
- Renewal approximations for the departure processes of batch systems. 34:95-104. 2002
- Decision-making and cooperative interaction via coupling agents in organizationally distributed systems. 34:789-802. 2002
- Renewal approximations for the departure processes of batch systems. 34:95-104. 2002
- The block layout shortest loop design problem. 32:727-734. 2000
- The block layout shortest loop design problem. 32:727-734. 2000
- A worker-based approach for modeling variability in task completion times. 32:625-636. 2000
- A worker-based approach for modeling variability in task completion times. 32:625-636. 2000
- Lot streaming and scheduling multiple products in two-machine no-wait flowshops. 31:695-707. 1999
- Lot streaming and scheduling multiple products in two-machine no-wait flowshops. 31:695-707. 1999
- Deadlock detection and resolution for discrete-event simulation: multiple-unit seizes. 30:201-216. 1998
- On offering economic incentives to backorder. 30:715-721. 1998
- On offering economic incentives to backorder. 30:715-721. 1998
- The development and evaluation of CUSUM-based control charts for an AR(1) process. 30:525-534. 1998
- Flexible manufacturing system structural control and the Neighborhood Policy, part 1. Correctness and scalability. 29:877-887. 1997
- Flexible manufacturing system structural control and the Neighborhood Policy, part 2. Generalization, optimization, and efficiency. 29:889-899. 1997
- An adaptable problem-space-based search method for flexible flow line scheduling. 29:115-125. 1997
- Production planning with stochastic seasonal demand and capacitated production. 29:1017-1029. 1997
- Adapting lot-sizing techniques to stochastic demand through production scheduling policy. 28:141-148. 1996
- Optimal Machining Speed and Tool Inventory Policies in Machining Economic Systems. 28:601-602. 1996
- Strategic and tactical analyses for optimal replacement policies. 28:987-993. 1996
- DEPENDENCE OF COMPUTED TRAJECTORY ON STEP-SIZE IN A NONLINEAR DYNAMIC SYSTEM - AN INVESTIGATION INTO CUTTING-TOOL DYNAMICS. 27:519-529. 1995
- ROBUSTNESS MEASURES AND ROBUST SCHEDULING FOR JOB SHOPS. 26:32-43. 1994
- ASYMMETRIC PATROLLING REPAIRMAN SYSTEMS WITH GENERAL REPAIR TIME AND WALK TIME DISTRIBUTIONS - COST-ANALYSIS OF SERVICE SCHEDULE. 25:19-26. 1993
- STATISTICAL ASSOCIATION LEARNING OF THE MARKOV DECISION-PROCESS. 25:86-98. 1993
- AN IMPROVED POLICY ITERATION ALGORITHM FOR SEMI-MARKOV MAINTENANCE PROBLEMS. 24:55-63. 1992
- PERSONAL FACTORS AFFECTING PERFORMANCE RATING ABILITY. 23:267-272. 1991
- A PRIMAL SIMPLEX SPECIALIZATION FOR THE EQUAL FLOW PROBLEM. 22:24-30. 1990
- OPTIMAL SCHEDULING OF MULTIPLE FEEDSTOCK BATCH BIOGAS PRODUCTION SYSTEMS. 18:367-373. 1986
- MULTICOMMODITY NETWORK PROBLEMS - APPLICATIONS AND COMPUTATIONS. 16:127-134. 1984
- Letter to the Editor. 16:401-402. 1984
- Hospital stockpiling for disaster planning 2011