publication venue for
- Routing Problem for Unmanned Aerial Vehicle Patrolling Missions - A Progressive Hedging Algorithm. 142:105702-105702. 2022
- An optimization-based approach for the healthcare districting under uncertainty. 135:105425-105425. 2021
- Optimizing a production-inventory system under a cost target. 123:105015-105015. 2020
- A multi-stage stochastic program for supply chain network redesign problem with price-dependent uncertain demands. 100:314-332. 2018
- Generalized multiple depot traveling salesmen problem-Polyhedral study and exact algorithm. 70:39-55. 2016
- Stage- and scenario-wise Fenchel decomposition for stochastic mixed 0-1 programs with special structure. 59:94-103. 2015
- Coordination in a two-stage production system: Complexity, conflict and cooperation. 39:1245-1256. 2012
- Optimal newsvendor policies for dual-sourcing supply chains: A disruption risk management framework. 39:350-357. 2012
- A decision rule for coordination of inventory and transportation in a two-stage supply chain with alternative supply sources. 38:1696-1704. 2011
- Three-stage DEA models for incorporating exogenous inputs. 37:1087-1090. 2010
- A unified model for detecting efficient and inefficient outliers in data envelopment analysis. 37:417-425. 2010
- A system dynamics model for dynamic capacity planning of remanufacturing in closed-loop supply chains. 34:367-394. 2007
- Mining market data: A network approach. 33:3171-3184. 2006
- Mining market data: A network approach. 33:3171-3184. 2006
- Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups. 33:158-180. 2006
- Solving multidimensional knapsack problems with generalized upper bound constraints using critical event tabu search. 32:825-848. 2005
- A heuristic approach for minimizing weighted tardiness and overtime costs in single resource scheduling. 31:1273-1301. 2004
- Towards the real time solution of strike force asset allocation problems. 31:273-291. 2004
- A pegging algorithm for the nonlinear resource allocation problem. 29:505-527. 2002
- One-operatortwo-machine flowshop scheduling with setup and dismounting times. 26:715-730. 1999
- Machining economics with phase-type distributed tool lives and periodic maintenance control. 23:53-62. 1996
- SCHEDULING ARRIVALS TO A QUEUE. 21:607-614. 1994
- THE DEVELOPMENT OF AN INTEGRATED MATHEMATICAL AND KNOWLEDGE-BASED MAINTENANCE DELIVERY SYSTEM. 19:425-434. 1992
- ON A LANGUAGE FOR DISCRETE DYNAMIC-PROGRAMMING AND A MICROCOMPUTER IMPLEMENTATION. 16:1-11. 1989
- A heuristic approximation for reducing problem size in network file allocation models. 11:387-395. 1984
- A stochastic recursive interactive programming model for farm firm policy analysis. 11:199-222. 1984
- Risk-averse multistage stochastic programs with expected conditional risk measures. 172:106802-106802.