selected publications academic article Yin, Y., Choi, K., Lee, Y., Jeong, H. D., & Liu, X. (2023). Determining the Most Economical Work Zone Lengths for Rural Highway Rehabilitation Projects. 39(2), 06022002. Alam-Khan, S., Cetin, B., Jeong, H. D., & Ashlock, J. C. (2023). Gravel Loss Prediction Model Using Beta Regression. Transportation Research Record. 036119812211486-036119812211486. Jeon, K., Lee, G., Yang, S., & Jeong, H. D. (2022). Named entity recognition of building construction defect information from text with linguistic noise. Automation in Construction. 143, 104543-104543. Le, T., Hassan, F., Le, C., & Jeong, H. D. (2022). Understanding dynamic data interaction between civil integrated management technologies: a review of use cases and enabling techniques. The International Journal of Construction Management. 22(6), 1011-1032. Yaw, M., Jeong, H. D., & Choi, K. (2022). Effects of Flexible Notice-to-Proceed Provisions on the Performance of Transportation Infrastructure Projects. Transportation Research Record. 2676(4), 790-800. Yin, Y., Choi, K., Jeong, H. D., & Touran, A. (2022). Integration of Schedule, Cost, Traffic, and Risk into the Determination of Construction Contract Times. Journal of Management in Engineering. 38(6), 04022061. Le, C., Jeong, H. D., Damnjanovic, I., & Bukkapatnam, S. (2022). Pareto Principle in Scoping-Phase Cost Estimating: A Multiobjective Optimization Approach for Selecting and Applying Optimal Major Work Items. Journal of Construction Engineering and Management. 148(8), 04022076. Ko, T., Jeong, H. D., & Lee, G. (2021). Natural Language Processing–Driven Model to Extract Contract Change Reasons and Altered Work Items for Advanced Retrieval of Change Orders. Journal of Construction Engineering and Management. 147(11), 04021147. Barutha, P. J., Jeong, H. D., Gransberg, D. D., & Touran, A. (2021). Evaluation of the Impact of Collaboration and Integration on Performance of Industrial Projects. Journal of Management in Engineering. 37(4), Le, C., Jeong, H. D., & Damnjanovic, I. (2021). Network Theory–Driven Construction Logic Knowledge Network: Process Modeling and Application in Highway Projects. Journal of Construction Engineering and Management. 147(10), 04021114. Choi, K., Yin, Y., Goehl, D., & Jeong, H. D. (2021). Alternative Contracting Methods: Modeling and Assessing the Effects of Contract Type on Time-Cost-Change Performance. Journal of Management in Engineering. 37(1), Le, C., Yaw, M. W., Jeong, H. D., & Choi, K. (2021). Comprehensive Evaluation of Influential Factors on Public Roadway Project Contract Time. Journal of Management in Engineering. 37(5), 04021044. Le, C., Shrestha, K. J., Jeong, H. D., & Damnjanovic, I. (2021). A sequential pattern mining driven framework for developing construction logic knowledge bases. Automation in Construction. 121, 103439-103439. Karaca, I., Gransberg, D. D., & Jeong, H. D. (2020). Improving the Accuracy of Early Cost Estimates on Transportation Infrastructure Projects. Journal of Management in Engineering. 36(5), Le, C., Jeong, H. D., Le, T., & Kang, Y. (2020). Evaluating Contractors' Production Performance in Highway Projects Using Historical Daily Work Report Data. Journal of Management in Engineering. 36(3), Abdelaty, A., Shrestha, K. J., & Jeong, H. D. (2020). Estimating Preconstruction Services for Bridge Design Projects. Journal of Management in Engineering. 36(4), 04020034. Choi, K., Jung, I., Yin, Y., Gurganus, C., & Jeong, H. D. (2020). Holistic Performance Evaluation of Highway Design-Build Projects. Journal of Management in Engineering. 36(4), 04020024. Le, T., Jeong, H. D., Gilbert, S. B., & Chukharev-Hudilainen, E. (2020). GENERATING PARTIAL CIVIL INFORMATION MODEL VIEWS USING A SEMANTIC INFORMATION RETRIEVAL APPROACH. Journal of Information Technology in Construction. 25, 41-54. Barutha, P., Nahvi, A., Cai, B., Jeong, H. D., & Sritharan, S. (2019). Evaluating commercial feasibility of a new tall wind tower design concept using a stochastic levelized cost of energy model. Journal of Cleaner Production. 240, 118001-118001. Le, C., Le, T., Jeong, H. D., & Lee, E. (2019). Geographic Information System-Based Framework for Estimating and Visualizing Unit Prices of Highway Work Items. Journal of Construction Engineering and Management. 145(8), 04019044. Chae, M., & Jeong, H. D. (2019). Acceptance Sampling Plans for Pipeline Condition Assessment. Journal of Pipeline Systems Engineering and Practice. 10(4), 04019024. Abdelaty, A., Jeong, H. D., & Smadi, O. (2018). Barriers to Implementing Data-Driven Pavement Treatment Performance Evaluation Process. 144(1), 04017022. Abdelaty, A., Attia, O. G., Jeong, H. D., & Gelder, B. K. (2018). Dynamic Pavement Delineation and Visualization Approach Using Data Mining. Journal of Computing in Civil Engineering. 32(4), 04018019. Pinto Nunez, M., Del Puerto, C. L., & Jeong, H. D. (2018). Development of a Partnering Maturity Assessment Tool for Transportation Agencies. Journal of Legal Affairs and Dispute Resolution (ASCE). 10(4), 04518021. Le, T., Le, C., & Jeong, H. D. (2018). Lifecycle Data Modeling to Support Transferring Project-Oriented Data to Asset-Oriented Systems in Transportation Projects. Journal of Management in Engineering. 34(4), 04018024. Le, T., Le, C., Jeong, H. D., & Jahren, C. (2018). Visual Exploration of Large Transportation Asset Data using Ontology-Based Heat Tree. International Journal of Transportation. 6(1), 47-58. Shrestha, K. J., & Jeong, H. D. (2017). Computational algorithm to automate as-built schedule development using digital daily work reports. Automation in Construction. 84, 315-322. Guo, F., Jahren, C. T., Turkan, Y., & Jeong, H. D. (2017). Civil Integrated Management: An Emerging Paradigm for Civil Infrastructure Project Delivery and Management. Journal of Management in Engineering. 33(2), 04016044. Lee, K., Han, S. H., Park, H., & Jeong, H. D. (2017). Empirical Analysis of Host-Country Effects in the International Construction Market: An Industry-Level Approach (vol 142, 2016). Journal of Construction Engineering and Management. 143(8), 08217001. Shrestha, K. J., Jeong, H. D., & Gransberg, D. D. (2017). Multidimensional Highway Construction Cost Indexes Using Dynamic Item Basket. Journal of Construction Engineering and Management. 143(8), 04017036. Le, T., & Jeong, H. D. (2017). NLP-Based Approach to Semantic Classification of Heterogeneous Transportation Asset Data Terminology. Journal of Computing in Civil Engineering. 31(6), 04017057. Abdelaty, A., Jeong, H. D., & Smadi, O. (2017). Practical Approach for Pavement Treatment Decisions for Local Agencies. Journal of Construction Engineering and Project Management. 7(1), 30-36. Park, H., Ting, S. H., & Jeong, H. D. (2016). Procedural Framework for Modeling the Likelihood of Failure of Underground Pipeline Assets. Journal of Pipeline Systems Engineering and Practice. 7(2), 04015023. Gardner, B. J., Gransberg, D. D., & Jeong, H. D. (2016). Reducing Data-Collection Efforts for Conceptual Cost Estimating at a Highway Agency. Journal of Construction Engineering and Management. 142(11), 04016057. Lee, K., Han, S. H., Park, H., & Jeong, H. D. (2016). Empirical Analysis of Host-Country Effects in the International Construction Market: An Industry-Level Approach. Journal of Construction Engineering and Management. 142(3), 04015092. Abdelaty, A., Jeong, H. D., Dannen, B., & Todey, F. (2016). Enhancing life cycle cost analysis with a novel cost classification framework for pavement rehabilitation projects. Construction Management and Economics. 34(10), 724-736. Alroomi, A., Jeong, H. D., & Oberlender, G. D. (2016). Evaluation of Methods to Retain Cost Estimating Competencies Using Structural Equation Modeling. Journal of Management in Engineering. 32(1), 04015026. Woldesenbet, A., Jeong, H. D., & Park, H. (2016). Framework for Integrating and Assessing Highway Infrastructure Data. Journal of Management in Engineering. 32(1), 04015028. Le, T., & Jeong, H. D. (2016). Interlinking life-cycle data spaces to support decision making in highway asset management. Automation in Construction. 64, 54-64. Craigie, E. K., Gransberg, D. D., & Jeong, H. D. (2016). Cost and Scope Breakdown Structure for Functional Level Estimating of Consultant Fees. Transportation Research Record. 2573(2573), 157-163. Syachrani, S., Jeong, H., & Chung, C. S. (2013). Decision TreeBased Deterioration Model for Buried Wastewater Pipelines. Journal of Performance of Constructed Facilities. 27(5), 633-645. Syachrani, S., Jeong, H. D., & Chung, C. S. (2013). Advanced criticality assessment method for sewer pipeline assets. Water Science and Technology. 67(6), 1302-1309. Syachrani, S., Jeong, H. S., & Chung, C. S. (2011). Dynamic Deterioration Models for Sewer Pipe Network. Journal of Pipeline Systems Engineering and Practice. 2(4), 123-131. Cooksey, S. R., Jeong, D., & Chae, M. J. (2011). Asset Management Assessment Model for State Departments of Transportation. Journal of Management in Engineering. 27(3), 159-169. Syachrani, S., Jeong, H. S., Rai, V., Chae, M. J., & Iseley, T. (2010). A risk management approach to safety assessment of trenchless technologies for culvert rehabilitation. Tunnelling and Underground Space Technology. 25(6), 681-688. Jeong, H. S., Atreya, S., Oberlender, G. D., & Chung, B. (2009). Automated contract time determination system for highway projects. Automation in Construction. 18(7), 957-965. Chung, B. Y., Syachrani, S., Jeong, H., & Kwak, Y. H. (2009). Applying Process Simulation Technique to Value Engineering Model: A Case Study of Hospital Building Project. IEEE Transactions on Engineering Management. 56(3), 549-559. Jeong, H. S., & Abraham, D. M. (2009). Water Rationing Model for Consequence Minimization of Water Infrastructure Destruction. Journal of Water Resources Planning and Management. 135(2), 80-89. Jeong, H. S., & Abraham, D. M. (2006). Operational Response Model for Physically Attacked Water Networks Using NSGA-II. Journal of Computing in Civil Engineering. 20(5), 328-338. Baik, H., Jeong, H. S., & Abraham, D. M. (2006). Estimating Transition Probabilities in Markov Chain-Based Deterioration Models for Management of Wastewater Systems. Journal of Water Resources Planning and Management. 132(1), 15-24. Jeong, H. S., Qiao, J., Abraham, D. M., Lawley, M., Richard, J., & Yih, Y. (2005). Minimizing the Consequences of Intentional Attack on Water Infrastructure. Computer-Aided Civil and Infrastructure Engineering. 21(2), 79-92. Jeong, H. S., Abraham, D. M., & Lew, J. J. (2004). Evaluation of an Emerging Market in Subsurface Utility Engineering. Journal of Construction Engineering and Management. 130(2), 225-234. Jeong, H. S., & Abraham, D. M. (2004). A decision tool for the selection of imaging technologies to detect underground infrastructure. Tunnelling and Underground Space Technology. 19(2), 175-191. chapter Jeon, K., Lee, G., & Jeong, H. D. (2020). Classification of the Requirement Sentences of the US DOT Standard Specification Using Deep Learning Algorithms. Proceedings of the 18th International Conference on Computing in Civil and Building Engineering. (pp. 89-97). Springer Nature. Le, C., Le, T., & Jeong, H. D. (2018). Geographic Information Systems (GIS) Based Visual Analytics Framework for Highway Project Performance Evaluation. Advances in Informatics and Computing in Civil and Construction Engineering. (pp. 719-724). Springer Nature. Jennex, M. E., Jeong, H. S., Abraham, D. M., & Abraham, D. M. (2008). Knowledge Management in Civil Infrastructure Systems. Murray E. Jennex. (Eds.), Knowledge Management. (pp. 1851-1858). IGI Global. conference paper Alikhani, H., & Jeong, H. D. (2022). Highway Project Clustering Using Unsupervised Machine Learning Approach. 172-179. Le, C., Ko, T., & Jeong, H. D. (2022). A Natural Language Processing-Based Approach for Clustering Construction Projects. 354-360. Alikhani, H., & Jeong, H. D. (2022). An Artificial Intelligence Based Model for Construction Activity Sequence Prediction in Highway Projects. 414-421. Abdelaty, A., Park, H., Jeong, H. D., & Gransberg, D. D. (2020). Analysis of Right-of-Way Acquisition Costs: Case Studies in Minnesota. 1158-1167. Le, C., & Jeong, H. D. (2020). Artificial Intelligence Framework for Developing a Critical Path Schedule Using Historical Daily Work Report Data. 565-573. Ko, T., & Jeong, H. D. (2020). Syntactic Approach to Extracting Key Elements of Work Modification Cause in Change-Order Documents. 134-142. Alam-Khan, S., Cetin, B., Jeong, H. D., & Ashlock, J. C. (2020). A System-Level Gravel Loss Prediction Model. Geotechnical Special Publications. 192-200. Yaw, M. W., Rybkowski, Z. K., & Jeong, H. D. (2020). Reducing Handoffs Between Sequential Trades: A Simulation. Annual Conference of the International Group for Lean Construction. 205-216. Shrestha, K. J., & Jeong, H. D. (2019). Automated Unit Price Visualization Using ArcPy Site Package in ArcGIS. 57-61. Barutha, P., Jeong, H. D., & Kang, Y. (2019). Comparison of Key Project Performance Indicators of Different Construction Sectors in Terms of Collaboration and Integration. 220-226. Shrestha, K. J., Le, C., Jeong, H. D., & Le, T. (2019). Mining Daily Work Report Data for Detecting Patterns of Construction Sequences. 578-583. Le, T., Jeong, H. D., Gilbert, S. B., & Chukharev-Hudilainen, E. (2018). Parsing Natural Language Queries for Extracting Data from Large-Scale Geospatial Transportation Asset Repositories. 70-79. Le, T., & Jeong, H. D. (2017). Keyword-Driven Model View Generation for Civil Infrastructure Projects. 254-261. Abdelaty, A., & Jeong, H. D. (2017). An enhanced framework for dynamic segmentation of pavement sections. 177-186. Abdelaty, A., Jeong, H. D., & Smadi, O. (2017). Radar chart tool for evaluating the performance of pavement rehabilitation treatments. 1216-1225. Shrestha, K. J., Jeong, H. D., & Gransberg, D. D. (2016). Current Practices of Highway Construction Cost Index Calculation and Utilization. 351-360. Le, T., & Jeong, H. D. (2016). Technical Term Similarity Model for Natural Language Based Data Retrieval in Civil Infrastructure Projects. 1048-1055. Guo, F., Turkan, Y., Jahren, C. T., & Jeong, H. D. (2014). Civil Information Modeling Adoption by Iowa and Missouri DOT. 463-471. Park, H., Lee, K., Jeong, H. D., & Han, S. H. (2014). Effect of Institutional Risks on the Performance of International Construction Projects. 2126-2135. Woldesenbet, A., & Jeong, H. D. (2014). Highway Data Quality Report Card (HDQRC): A Conceptual Framework of Pavement Management Data. 2021-2031. Park, H., Lee, K. W., Jeong, H. D., & Han, S. H. (2014). Effect of institutional risks on the performance of international construction projects. 2126-2135. Woldesenbet, A., & Jeong, H. D. (2014). Highway data quality report card (HDQ RC ): A conceptual framework of pavement management data. 2021-2031. Jeong, H. S., Syachrani, S., & Chung, C. S. (2011). Theoretical issues in advancing infrastructure asset management programs. 417-418. Jeong, H. S., & Abraham, D. M. (2006). Water Rationing Model for Water Networks under Short-Term Water Supply Shortage. 1-11. Jeong, H. S., Baik, H. S., & Abraham, D. M. (2005). An ordered probit model approach for developing Markov chain based deterioration model for wastewater infrastructure systems. 649-661. Jeong, H. S., Qiao, J., Abraham, D. M., Lawley, M., Richard, J. P., & Yih, Y. (2005). A consequence mitigation model for water networks subject to intentional physical attacks. 957-968. Jeong, H. S., Abraham, D. M., Qiao, J., Lawley, M. A., Richard, J., & Yih, Y. (2004). Issues in risk management of water networks against intentional attacks. 161-170. Jeong, H. S., Abraham, D. M., & Lew, J. J. (2003). Pipeline Damage Prevention Systems. 1429-1437.
principal investigator on A Natural Language Based Data Retrieval Engine for Automated Digital Data Extraction for Civil Infrastructure Projects awarded by Directorate for Engineering - (Arlington, Virginia, United States) 2018 - 2020
teaching activities ARCH685 Directed Studies Instructor ARCH691 Research Instructor COSC624 Const Business Dvlopmnt Instructor COSC685 Directed Studies Instructor COSC689 Sptp:const Acct & Finc Mgmt Instructor COSC691 Research Instructor ITDE691 Research Instructor
education and training Ph.D. in Civil Engineering, Purdue University - (West Lafayette, Indiana, United States) 2005 M.S. in Civil Engineering, Purdue University - (West Lafayette, Indiana, United States) 2001 B.S. in Agricultural Engineering (Specialization in Civil Engineering), Seoul National University - (Seoul, South Korea) 1994