A STUDY OF ENGINEERING DESIGN PROJECT COMPLEXITY AND RISK INDICATORS Conference Paper uri icon

abstract

  • Engineering design projects can be characterized by three dimensions: duration, budget, and scope. As projects grow in any of these three dimensions, there will be increased opportunity for uncertainty, and subsequently, increased risk. This study explored the relationship between the number of project activities and the presence of risk indicators. A risk indicator is a particular state of affairs that has potential predictive power about the likelihood of a risk occurring during the course of a project. This study was completed by examining eleven projects that were conducted within one division of a large engineering design firm. Projects were divided into groups according to the number of activities associated with each project, and interviews were conducted with employees, who worked in a variety of positions. A comparative analysis of risk indicators was then completed to identify potential watch areas and provide a basis for risk mitigation planning. The study provided conclusive evidence that the most frequently occurring risk indicators vary with the number of activities involved in a project. Project managers can use this information to create more specific risk management plans tailored to the types of risk indicators most frequently associated with the number of activities within a project.

name of conference

  • Volume 2B: 33rd Computers and Information in Engineering Conference

published proceedings

  • PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2013, VOL 2B

author list (cited authors)

  • Yim, R. L., Castaneda, J. M., Doolen, T. L., Tumer, I. Y., & Malak, R. J.

citation count

  • 1

complete list of authors

  • Yim, Rachel L||Castaneda, Jason M||Doolen, Toni L||Tumer, Irem Y||Malak, Richard J

publication date

  • January 2014