Threshold-based parallel multiuser scheduling**This work was supported in part by the Qatar Foundation for Education, Sciences, and Community Development, Doha, Qatar and in part by Qatar Telecom (Qtel), Qatar. Conference Paper uri icon

abstract

  • In this paper, we propose two new threshold based parallel multiuser scheduling schemes, namely (i) an on-off based scheduling (OOBS) scheme and (ii) a switched based scheduling (SBS) scheme. The objective is to reduce the complexity of implementation without a considerable performance loss in comparison with selection based scheduling. While the OOBS scheme schedules all the users with an SNR above a fixed pre-selected signal to noise ratio (SNR) threshold, the SBS scheme schedules only the K3 users with an acceptable SNR if there are enough acceptable users. Otherwise, the scheduler selects the best Ks users. We analyze statistical characteristics and performances of these proposed schemes. Numerical results show that the proposed schemes can offer some decrease in the average number of feedback load without an important degradation in average bit error rate and average spectral efficiency. 2007 IEEE.

name of conference

  • 2007 IEEE 18th International Symposium on Personal, Indoor and Mobile Radio Communications

published proceedings

  • 2007 IEEE 18th International Symposium on Personal, Indoor and Mobile Radio Communications

altmetric score

  • 3

author list (cited authors)

  • Nam, S. S., Alouini, M., Qaraqe, K. A., & Yang, H.

citation count

  • 4

complete list of authors

  • Nam, Sung Sik||Alouini, Mohamed-Slim||Qaraqe, Khalid A||Yang, Hong-Chuan

publication date

  • January 2007