Computational algorithm to automate as-built schedule development using digital daily work reports
Academic Article
-
- Overview
-
- Research
-
- Identity
-
- Additional Document Info
-
- View All
-
Overview
abstract
-
© 2017 Elsevier B.V. As-built schedules prepared during and after construction are valuable tools for State Highway Agencies (SHAs) to monitor construction progress, evaluate contractor's schedule performance, and defend against any potential disputes. However, previous studies indicate that current as-built schedule development methods are manual and rely on information scattered in various field diaries and meeting minutes. SHAs have started to collect field activity data in digital databases that can be used to automatically generate as-built schedules if proper computational algorithms are developed. This study develops computational algorithms and a prototype system to automatically generate and visualize project level and activity level as-built schedules during and after construction. The algorithm is validated using a real highway project data. The study is expected to significantly aid SHAs in making better use of field data, facilitate as-built schedule development, monitor construction progress with higher granularity, and utilize as-built schedule for productivity analysis.
published proceedings
-
Automation in Construction
author list (cited authors)
-
Shrestha, K. J., & Jeong, H. D.
citation count
complete list of authors
-
Shrestha, K Joseph||Jeong, H David
publication date
publisher
published in
Research
keywords
-
As-built Schedule
-
As-built-schedule-automation
-
Bioengineering
-
Daily Work Report
-
Schedule
Identity
Digital Object Identifier (DOI)
Additional Document Info
start page
end page
volume