Equivalent drawdown time for pressure buildup test analysis for hydraulically fractured wells
Conference Paper
Overview
Additional Document Info
View All
Overview
abstract
This paper presents an equivalent drawdown time for hydraulically fractured wells. This new equivalent time is derived from a general elliptical flow model. This new equivalent time is helpful in post-fracture pressure buildup test analysis for wells with finite-conductivity fractures including wellbore storage and fracture-face skin. Examples are provided.