A study of the factors construction time for projects in South India Conference Paper uri icon

abstract

  • The purpose of this study is to determine the factors of actual construction time for commercial and residential projects in South India. The data for the study was obtained from some leading architectural and engineering companies in India. The sample size consisted of data for 90 completed construction projects in various locations within the region. Analysis of the data was done using a General Linear Model. The results indicated that actual construction cost and methods of project delivery are major factors that can be used to predict actual construction time of such projects in South India. 2011 American Society for Engineering Education.

published proceedings

  • ASEE Annual Conference and Exposition, Conference Proceedings

author list (cited authors)

  • Choudhury, I.

complete list of authors

  • Choudhury, I

publication date

  • January 2011