Optimal Scheduling of Biodiesel Plants through Property-based Integration with Oil Refineries
Book
Overview
Research
Identity
Additional Document Info
Other
View All
Overview
abstract
This paper addresses the design and scheduling problem of biodiesel plants in conjunction with typical oil refineries via blending of biodiesel and petro-diesel. The feedstocks are often seasonal and their availability and cost usually vary with time. A multi-period scheduling framework is formulated as an optimization problem to determine the optimal feedstock utilization and blending of biodiesel with petro-diesel using a property-integration framework. A case study is solved to illustrate the applicability of the devised approach. 2011 Elsevier B.V.