Topology Control for Load Shed Recovery
Academic Article
Overview
Research
Identity
Additional Document Info
View All
Overview
abstract
This paper introduces load shed recovery actions for transmission networks by presenting the dc optimal load shed recovery with transmission switching model (DCOLSR-TS). The model seeks to reduce the amount of load shed, which may result due to transmission line and/or generator contingencies, by modifying the bulk power system topology. Since solving DCOLSR-TS is computationally difficult, the current work also develops a heuristic (MIP-H), which improves the system topology while specifying the required sequence of switching operations. Experimental results on a list of N-1 and N-2 critical contingencies of the IEEE 118-bus test case demonstrate the advantages of utilizing MIP-H for both online load shed recovery and recurring contingency-response analysis. This is reinforced by the introduction of a parallelized version of the heuristic (Par-MIP-H), which solves the list of critical contingencies close to 5x faster than MIP-H with 8 cores and up to 14x faster with increased computational resources. The current work also tests MIP-H on a real-life, large-scale network in order to measure the computational performance of this tool on a real-world implementation. 1969-2012 IEEE.